Project head | Prof. Dr.-Ing. R.
Hinkelmann [1] |
Scientific assistant | Qing Zhang
M.Sc. |
Project period | April 2015 - March
2017 |
Project partner | BfG Federal Institute of
Hydrology |
Descriptions
[2]
- © BfG
This research is a part of the project "Sedimentmanagement of the Upper Rhine" and carried out in cooperation with BfG.
The sediment management in the Upper Rhine River can be affected in the long-term by various natural or anthropogenic activities, e.g. the climate change and land use changes, restoration and engineering measures. To investigate such impacts, a long-term simulation of such scenarios is necessary.
In this research, the long-term dynamics of the fine sediment budget in the Upper Rhine will be determined (i.e. how long does it take to refresh the top layer of the deposition?).
Furthermore, morphodynamic processes in the Iffezheim reservoir with non-uniform bed composition will also be investigated using SSIIM 3D modeling system. High-resolution numerical models combined with other suitable methods will be chosen for the scenario analyse. The results will serve as the basis for a much coarser sediment budget model of the Upper Rhine.
The research will include:
- Coarsening of grid
- Classification of upstream boundary condition
- Time-series analysis
- Artificial neural network
Study Area
- Map of the Iffezheim Reservoir
[3]
- © google earth
The Iffezheim reservoir consists of a weir, a hydropower plant, a ship lock and a fish passage.
Field Data
- River bed evolution after dredging in the weir channel of the Iffezheim Reservoir
[4]
- © Q.Zhang/BfG
The focus area of the investigation is based on the weir channel where more than 115.000 m³ of suspended sediments are depositecd every year (WSA,2011). With regard to flood protection requirements, the responsible water and shipping authority has to complete regular dredging of the area. The river bed evolution is presented in the figure from 2005 December to 2007 April. WSA, Wasser- und Schifffahrtsamt, Freiburg, 2011. Sachstandbericht oberer Wehrkannal Staustufe Iffezheim 2011.
Simulation Results
- Coarsening of the spatial grid resolution of the model catchment
[5]
- © T. Speckter/Q.Zhang
A high-resolution model was set up for investigations of river morphodynamic processes in the Iffezheim Reservoir. For the long-term simulation the coarsening of the spatial grid resolution was carried out. The impact of this coarsening on the accuracy of the hydraulic and morphodynamic parameters with further consideration of the processing time was investigated.
- Flow velocity field using different upstream boundary conditions
[6]
- © Q.Zhang
The simulation of sediment transport consists of three steps in the SSIIM programme:
- water flow simulation with steady state condition
- sediment transport simulation with steady state condition
- sediment transport simulation with unsteady conditions according to the measured data
- Suspension concentration in the gauging station Hügelsheim a) measurement b) simulation with 3d-concentration distribution c) with Hunter-Rouse-Distribution
[7]
- © Q.Zhang, T.Speckter/BfG
Since the sediment concentration is distributed inhomogenously in the river bed, the fitting method polynomial regression is used to define a concentration profile of suspended sediment at the model boundary.
Dates
- 25th - 26th of March, 2015: CHR Spring Seminar- " From source to mouth, a sediment budget of the Rhine River" in Lyon, France
- 16th - 17th of July, 2015: GESINUS Meeting in Aachen, Germany
- 28th of Juni - 3rd of July, 2015: 36th IAHR World Congress in the Hague, Netherland
- 3rd - 4th of November, 2015: 17th Morphological Colloquium, Koblenz, Germany
- 15th - 16th of June, 2016: GESINUS Meeting in Magdeburg, Germany
- 11st - 15th of July, 2016: River Flow 2016, 8th International Conference on Fluvial Hydraulics, St. Louis, USA
- 1st - 5th of August, 2016: Sediment Transport in Stream Assessment and Design, Workshop, Logan, Utah, USA
- 19th - 22th of September, 2016: International Symposium on River Sedimentation in Stuttgart, Germany
- 23th -
28th of April, 2017: European
Geosciences Union General Assembly 2017,
Vienna, Austria
Theses
2015
Speckter, T.F.: Auswirkungen vergröberter räumlicher und zeitlicher Gitternetzauflösungen bei der hoch aufgelösten Modellierung von Hydraulik und Sedimenttransport an der Staustufe Iffezheim, Master thesis (Civil engineering).
Zhang, Q., Speckter, T.F., R. Hinkelmann: Auswirkungen vergröberter räumlicher und zeitlicher Gitternetzauflösungen bei der hoch aufgelösten Modellierung von Hydraulik und Sedimenttransport an der Staustufe Iffezheim, Presentation, GESINUS Meeting, Aachen.
2016
Brandolini, A.: Grouping upstream boundary conditions - river discharges and suspended sediment concentrations from 1978-2009, student research project.
2017
Truong, T.M.: Bestimmung eines ARIMA-Modells zum Erstellen einer Vorhersage der monatlichen Abflüsse der Staustufe Iffzheim, student research project.
Scheer, C.L.: Literature Research on the application of artificial neural networks (ANNs) in river morphology, student research project.
head/prof_dr_ing_reinhard_hinkelmann/parameter/en/font3
/minhilfe/
hungsprojekte/sedioberrhein/bfg_logo.png
hungsprojekte/sedioberrhein/Slide1.png
hungsprojekte/sedioberrhein/RiverBed_Evolusion.png
hungsprojekte/sedioberrhein/grid_resolution_04.png
hungsprojekte/sedioberrhein/velocity_field.png
hungsprojekte/sedioberrhein/conc_profil_2.png
rch_projects/finished_projects/long_term_simulation_of_
sediment_transport_in_the_upper_rhine/parameter/en/font
3/minhilfe/?tx_sibibtex_pi1%5Bcontentelement%5D=tt_cont
ent%3A677542&tx_sibibtex_pi1%5BshowUid%5D=1374281&a
mp;cHash=05f52b5e8728f37dc2bf00543bc4175f
rch_projects/finished_projects/long_term_simulation_of_
sediment_transport_in_the_upper_rhine/parameter/en/font
3/minhilfe/?no_cache=1&tx_sibibtex_pi1%5Bdownload_b
ibtex_uid%5D=1374281&tx_sibibtex_pi1%5Bcontenteleme
nt%5D=tt_content%3A677542
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?tx_sibibtex_pi1%5Bcontentelement%5D=tt_con
tent%3A677542&tx_sibibtex_pi1%5BshowUid%5D=1306766&
amp;cHash=fcc7ddfbd0af53ba815555b117c22012
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?no_cache=1&tx_sibibtex_pi1%5Bdownload_
bibtex_uid%5D=1306766&tx_sibibtex_pi1%5Bcontentelem
ent%5D=tt_content%3A677542
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?tx_sibibtex_pi1%5Bcontentelement%5D=tt_con
tent%3A677542&tx_sibibtex_pi1%5BshowUid%5D=1187391&
amp;cHash=b67837fa796aec72062afe6e2a012fc4
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?no_cache=1&tx_sibibtex_pi1%5Bdownload_
bibtex_uid%5D=1187391&tx_sibibtex_pi1%5Bcontentelem
ent%5D=tt_content%3A677542
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?tx_sibibtex_pi1%5Bcontentelement%5D=tt_con
tent%3A677542&tx_sibibtex_pi1%5BshowUid%5D=1206334&
amp;cHash=7866c881824900ebaff1ad3ac4474325
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?no_cache=1&tx_sibibtex_pi1%5Bdownload_
bibtex_uid%5D=1206334&tx_sibibtex_pi1%5Bcontentelem
ent%5D=tt_content%3A677542
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?tx_sibibtex_pi1%5Bcontentelement%5D=tt_con
tent%3A677542&tx_sibibtex_pi1%5BshowUid%5D=1207622&
amp;cHash=5946c49f271750d15d81ea07369298c2
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?no_cache=1&tx_sibibtex_pi1%5Bdownload_
bibtex_uid%5D=1207622&tx_sibibtex_pi1%5Bcontentelem
ent%5D=tt_content%3A677542
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?tx_sibibtex_pi1%5Bcontentelement%5D=tt_con
tent%3A677542&tx_sibibtex_pi1%5BshowUid%5D=1322330&
amp;cHash=7d1ab6791a14b261e86f296b269c2bcc
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?no_cache=1&tx_sibibtex_pi1%5Bdownload_
bibtex_uid%5D=1322330&tx_sibibtex_pi1%5Bcontentelem
ent%5D=tt_content%3A677542
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?tx_sibibtex_pi1%5Bcontentelement%5D=tt_con
tent%3A677542&tx_sibibtex_pi1%5BshowUid%5D=733971&a
mp;cHash=d9e8922412379e6ad372eaf09a479809
arch_projects/finished_projects/long_term_simulation_of
_sediment_transport_in_the_upper_rhine/parameter/en/fon
t3/minhilfe/?no_cache=1&tx_sibibtex_pi1%5Bdownload_
bibtex_uid%5D=733971&tx_sibibtex_pi1%5Bcontenteleme
nt%5D=tt_content%3A677542